Panel building
All panels are assembled with care, tested and checked before shipment to the site. Testing procedure includes full functional test of all installed equipment (all tests that can be executed in the workshop: power on, wiring, I/O test…).
Full load test is executed on request. Marking and labeling of equipment according todesign is executed as the standard.
Regardless from what kind of panel is assembled in our workshop:
- low voltage power distribution
- MCC
- PLC / DCS panel
- project specific panel